PSU NEWS
THDC commences draft tube installation for Vishnugad Pipalkoti HEP in Uttarakhand
The 444 MW hydroelectric project is located on the Alaknanda River, near Helong village in Uttarakhand.
THDC India Limited has commenced the installation of the draft tube in Unit 1 of the Vishnugad Pipalkoti Hydroelectric project (HEP).
The draft tube is crucial for channeling water that has passed through the turbine blades back into the river while maintaining pressure and enabling energy recovery.
This installation is essential for optimizing the overall performance and efficiency of the power generation process.
The 444 MW hydroelectric project is located on the Alaknanda River, near Helong village in Uttarakhand.
Read Also : NLCIL signs MoU with IIM CalcuttaNews Must Read
- India’s Largest Bank, SBI raised Rs. 7,500 cr
- Indian Bank raises Rs. 5,000 Crores through issuance of Bonds
- NLCIL plans three fold increase in its total power generation capacity by 2030
- DVC enters into financial collaboration with State Bank of India
- IREDA Signs MoU with SJVN and GMR for 900 MW Hydropower Project in Nepal
- IREDA Signs MoU with SJVN and GMR fo Hydro Project in Nepal
- SJVN CMD visited 1320 MW Buxar Thermal Power Project
- Petroleum Minister Hardeep S Puri Highlights India’s Bioenergy Progress
- NBCC bags orders worth Rs. 182.50 Crore
- OMCs increases price of 19 kg commercial LPG cylinder by Rs 39