NHPC has successfully commissioned Dam Toe Power House having installed capacity of 2.4 MW
NHPC has successfully commissioned Dam Toe Power House having installed capacity of 2.4 MW
NHPC has successfully commissioned Dam Toe Power House having installed capacity of 2.4 MW (3 x0.8 MW) on 19.11.2024 in the presence of Sh. R.K. Chaudhary, CMD, NHPC. Sh. Suprakash Adhikari, ED (O&M), Sh. Ram Swarup, ED RO-Jammu & Sh. Lakhmi Chand, HOP, Kishanganga & Kishanganga team were also present on the occasion.
This is one of the first Power Plant of NHPC which shall utilise ecological flow of 9.0 cumec being released from Dam. The Power generated by this plant shall be fed to the Dam auxiliaries and local grid benefiting the people of remote border areas in the Gurez valley, Bandipora (J&K) which remains cut off from the grid during winter season
Join PSU Connect on WhatsApp now for quick updates! Click here
Read Also : NMDC Swarojgar Yojana Sparks Self-Employment Revolution in Kondagaon, ChhattisgarhNews Must Read
- ONGC Executive Director, Sanjay Bhatt superannuates
- Oil India plans to Launch Subsidiary for Green Energy Ventures
- NTPC signs tripartite MoU to build green hydrogen infrastructure in Odisha
- BEL contributes Rs. 1.89 Cr to Kerala Flood Relief
- Defense Stock, Bharat Electronics shares surges over 1.12% amid securing project worth Rs 973 crore
- IREDA Sanctions Over Rs. 3,000 Crore; CMD Commits Support for State 10 GW RE Target
- Defence Ministry awards major order to L&T
- Sensex opens with over 800 points, Nifty trading up 1.15% with positive market trend
- BEML Ltd Unveils India’s Biggest and Advanced Crawler Dozer
- IREDA Bags Triple Honours at 14th PSE Excellence Awards