Delhi Metro to expand Mukundpur Depot with additional facilities
Six new elevated stabling lines will come up at the already operational Majlis Park Metro Station (Pink Line).
Delhi Metro to expand Mukundpur Depot with additional facilities
New Delhi: The Delhi Metro is augmenting the capacity of its Mukundpur Depot to cater to the additional requirements of two of its upcoming Phase 4 corridors i.e., Majlis Park to Maujpur (Extension of Pink Line) and Janakpuri West to R K Ashram Marg (Extension of Magenta Line). For Phase 4 sections, DMRC has decided not to acquire additional land for new depots. Rather, the existing depots are being expanded.
Some of the existing stabling lines in Mukundpur Depot will be further expanded and some new stabling lines will be added to accommodate more trains for stabling and maintenance. The Mukundpur depot currently has 24 stabling lines. Of these, 11 are being extended in length and will be used for stabling and maintenance of rolling stock of Pink Line, while the rest 13 stabling lines will cater to the needs of Magenta Line.
In addition, six new elevated stabling lines will come up at the already operational Majlis Park Metro Station (Pink Line). These elevated stabling lines will reduce the burden on Depot and bring down the train induction time once the stabling lines become operational. This will be similar to the elevated stabling facility built at the Jasola Vihar Shaheenbagh Metro Station of Magenta Line.
Apart from Mukundpur Depot, the existing depots at Sarita Vihar and Ajronda are also being expanded with additional facilities to support the Silver Line (Delhi Aerocity to Tughlakabad) of Phase 4 and the operational Violet Line (Line 6 – Kashmere Gate to Raja Nahar Singh).
With these initiatives, the Delhi Metro intends to avoid acquisition of additional land for construction of new depots and facilities for the phase iv corridors. Rather, the existing resources with enhanced capacity will be utilised to their full potential, thus reducing expenditure and manpower requirement. The expanded depots will also include new test tracks for Pink and Magenta Lines.
Tenders have already been awarded for the expansion of most of the Depot components. The revamped facility at Mukundpur Depot is expected to be made operational by the end of year 2024. Under Phase 4, the Delhi Metro is adding around 65 kilometers on new lines on three corridors i.e., Majlis Park to Maujpur (12.31 km), Janakpuri West to R K Ashram Marg (29.26 km) and Delhi Aerocity to Tughlakabad (23.62 km). The construction work on these corridors is under progress.
Join PSU Connect on WhatsApp now for quick updates! Click here
Read Also : IndianOil Wins Big at FICCI Indian Sports Awards 2024 for Championing Sports DevelopmentNews Must Read
- IndianOil Wins Big at FICCI Indian Sports Awards 2024 for Championing Sports Development
- Cochin Shipyard Limited signs contract with Defence Ministry
- ONGC launched 35-seater Electric buses in Mumbai
- BSNL tie up with SBI for Payment Gateway Partnership
- ONGC Videsh acquires 0.615% Stake in ACG and 0.737% stake in BTC, Azerbaijan
- Numaligarh Refinery Limited achieved milestone
- GAIL signs long-term contract with “K” LINE for LNG ship
- RVNL stands as Lowest bidder from PSPCL
- NTPC CVO Rashmita Jha Appointed as Additional CVO for REC Ltd
- SAIL and John Cockerill India join hands to drive innovation and green steel technologies