NHPC signs MoU with Central Water Commission to review design consultancy
The MoU was signed by Shri S. K. Sharma, Director, CWC, and Shri Shrish Dubey, GM (D&E), NHPC, in the presence of Shri Bhopal Singh, Member (D&R), Shri S.D. Sharma, Chief Engineer (Design—E&NE), CWC, and Shri V. K. Saini, ED (D&E), NHPC.
NHPC signs MoU with Central Water Commission to review design consultancy
In a significant move to ensure timely restoration of the NHPC Teesta-V Power Station in Sikkim, a Memorandum of Understanding (MoU) for Review Design Consultancy has been signed between the Central Water Commission (CWC) and NHPC Limited on 20.12.2024.
The MoU was signed by Shri S. K. Sharma, Director, CWC, and Shri Shrish Dubey, GM (D&E), NHPC, in the presence of Shri Bhopal Singh, Member (D&R), Shri S.D. Sharma, Chief Engineer (Design—E&NE), CWC, and Shri V. K. Saini, ED (D&E), NHPC.
The MoU focuses on review and consultancy work for the hydraulic design of the Tunnel Spillway and Dam to facilitate the passage of enhanced discharge from the Teesta-V Dam. This collaboration is expected to play a pivotal role in improving coordination and progress and developing a better understanding of design practices.
Join PSU Connect on WhatsApp now for quick updates! Click here
Read Also : BEML Ltd Unveils India’s Biggest and Advanced Crawler DozerNews Must Read
- G Gayatri Prasad assumes charge as Director (Finance) of BDL
- GRSE builts indigenous INS Nirdeshak to join Indian Navy’s fleet
- Free Travel During Maha Kumbh Mela? Indian Railways Clarifies...
- Indian Army and BEL collaborates to establish advanced AI hub in Bengaluru
- SJVN’s Rampur Hydro Power Station Beats Target by 3 Months
- Bhutanese Delegation Visits at THDCIL's VPHEP Project
- Abhijit Majumder appointed as CFO at Oil India Ltd
- RITES bags Major order of Rs. 122.60 Crores
- Coal & Lignite Public Sectors establishes 16 Eco-Parks over last 5 years to promote tourism
- BEML and NHPC Ltd Sign MoU for Hydroelectric Power Plants