power-sector-news
Cabinet Approves Regularisation of Pay Scales of below Board Level Executives in NHPC NEEPCO THDC and SJVN
New Delhi: The Union Cabinet, lead by the Prime Minister Shri Narendra Modi, has given approval to regularization of Pay scales of below Board Level Executives in National Hydroelectric Power Corporation Ltd. (NHPC), North East Electric Power Corporation (NEEPCO), THDC India Ltd. (formerly Tehri Hydro Development Corporation Ltd.) and Satluj Jal Vidhyut Nigam Ltd. (SJVN). After the approval, the pay scales adopted by Hydro CPSEs consequent upon the order of the Ministry of Power dated 4th April 2006 and 1st Sep 2006 shall be regularized.
About 5,254 Executives of Hydro CPSEs enrolled before 1st January 2007 will be benefitted by this approval. The total expenditure to the tune of Rs. 323 crore will be incurred for the regularisation of pay scales.
Anomalies existed in the pay scales of Executives of NHPC, NEEPCO, THDCIL and SJVNL with effect from 1st January 1997 due to the revision of pay scales of the unionized category of workmen/non-executives in line with the NTPC/Oil sector within the organizations. The pay scales of workmen and Supervisors were higher than the pay scale of Executives in the E-1 grade.
The proposal was earlier considered by the Committee of Secretaries (CoS) and the Cabinet on several occasion. The Cabinet in December 2013 decided as below:
The deviant pay scales fixed w.e.f. 01.01.1997 shall not be regularized. However, no recovery shall be made for the excess pay drawn from 01.01,1997onwards considering the difficulties in effecting recovery and also considering that such a recovery may de-motivate the staff.
The pay scales shall be fitted w.e.f. 01.01.2007 after correcting the aberration in payscales fixed w.e.f. 01.01.1997. Aggrieved with the order, various Employee Associations of Hydro PSEs filed Writ Petitions in different High Courts. The High Court of Uttarakhand&Meghalaya quashed the above decision. SLP was filed in Supreme Court on-12.04.2017 against the judgment of High Court of Uttarakhand which was dismissed on 08.05.2017. A Contempt petition has been filed in the High Courts of Meghalaya and Uttarakhand. Ministry of Power is left with no option other than seeking approval of Cabinet for regularizing the pay scales of NHPC, SJVNL, NEEPCO and THDCIL w.e.f. 01.01.1997 adopted by them consequent upon the orders of Ministry of Power dated 04.04.2006 and 01.09.2006. PIB
Read Also : Indian Air Force ushers in Digital Transformation with DigiLocker Integration
News Must Read
- NCL General Manager (Finance) D Sunil Kumar recommended for SECL Director (Finance)
- Bank of Maharashtra Q4 results, Net Profit increased by 44.95 percent to Rs 1,218 crore
- Axis Bank Overtakes Kotak Mahindra Bank to Become India's Fourth Most Valued Lender
- LIC cuts stakes in major PSU stocks
- SJVN CMD Geeta Kapur Inaugurates Construction Works at Sunni Dam Project in Himachal Pradesh
- PESB Selects R Veerabahu as Director (Finance) for Braithwaite & Co. Limited
- Grew Energy bags largest order of 200 MW Contract of SECI's Auction
- CPCL Reports 39% YoY Drop in Q4 Net Profit, Declares Rs 55 per Share Dividend
- SJVN Limited inaugurates India's first Multi-purpose Green Hydrogen Pilot Project
- KRDCL, RVNL JV emerges as the Lowest Bidder for Redevelopment of Thiruvananthapuram Central Railway Station